A platform for research: civil engineering, architecture and urbanism
Design and construction of segmental lining for the double track TBM tunnel of the Athens Metro
Design and construction of segmental lining for the double track TBM tunnel of the Athens Metro
Design and construction of segmental lining for the double track TBM tunnel of the Athens Metro
Lagios, P. (author) / Papamakarios, A. (author) / Koukoutas, S. (author) / Negro, A. / Ferreira, A. A. / International Tunnelling Association
World tunnel congress, Tunnels and metropolises ; 1998 ; Sao Paulo; Brazil
Tunnels and metropolises ; 793-798
1998-01-01
6 pages
Conference paper
English
tunnels , metropolises , ITA
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Copenhagen Metro, segmental tunnel lining durability strategy and the supervision thereof
British Library Conference Proceedings | 2003
|Athens metro: Construction of the Syntagma double station
British Library Online Contents | 1997
|Athens metro - Construction of the Syntagma double station
Online Contents | 1997
|Channel tunnel: Concrete lining, segmental and non-segmental
British Library Conference Proceedings | 1994
|Athens Metro Line 3: Complex Tunnel Geometries
Online Contents | 2014
|