A platform for research: civil engineering, architecture and urbanism
Extension and Application of Prosser-Dunne Model to Traffic Operation Analysis of Oversaturated, Closely Spaced Signalized Intersections
Extension and Application of Prosser-Dunne Model to Traffic Operation Analysis of Oversaturated, Closely Spaced Signalized Intersections
Extension and Application of Prosser-Dunne Model to Traffic Operation Analysis of Oversaturated, Closely Spaced Signalized Intersections
Session, Highway capacity issues 1998 ; 1998 ; Washington; DC [unconfirmed]
1998-01-01
9 pages
Held as part of the 77th annual meeting of the Transportation Research Board
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
British Library Online Contents | 1998
|Simulation Studies of Traffic Operations at Oversaturated, Closely Spaced Signalized Intersections
British Library Conference Proceedings | 1998
|Simulation Studies of Traffic Operations at Oversaturated, Closely Spaced Signalized Intersections
British Library Online Contents | 1998
|Evaluation of Presignals at Oversaturated Signalized Intersections
British Library Online Contents | 2014
|Arrival-Based Uniform Delay Model for Oversaturated Signalized Intersections with Poor Progression
British Library Online Contents | 2005
|