A platform for research: civil engineering, architecture and urbanism
Estimating Excavation Duration: OOP Plus NN Approach
Estimating Excavation Duration: OOP Plus NN Approach
Estimating Excavation Duration: OOP Plus NN Approach
Congress; 5th, International computing in civil engineering ; 1998 ; Boston; MA
1998-01-01
8 pages
Held at the 15th Computing congress in conjunction with the 1998 ASCE annual convention and exhibition. Theme title: "Information technologies in civil engineering - leading the World"
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
TIBKAT | 2000
|Estimating subsurface feature locations during excavation
European Patent Office | 2020
|A Probabilistic Approach for Estimating Tunneling Duration
British Library Online Contents | 1998
|A PROBABILISTIC APPROACH FOR ESTIMATING TUNNELING DURATION
Taylor & Francis Verlag | 1998
|A Probabilistic Approach for Estimating Tunneling Duration
Online Contents | 1998
|