A platform for research: civil engineering, architecture and urbanism
The use of a composite HDPE membrane / bentonite-cement slurry trench cut-off at Broadwood Loch, Cumbernauld
The use of a composite HDPE membrane / bentonite-cement slurry trench cut-off at Broadwood Loch, Cumbernauld
The use of a composite HDPE membrane / bentonite-cement slurry trench cut-off at Broadwood Loch, Cumbernauld
Barr, K. M. H. (author) / Berry, C. W. (author) / Barker, P. J. (author) / Tedd, P. / British Dam Society
Conference; 10th, British Dam Society: The prospect for reservoirs in the 21st century; proceedings of the tenth conference of the BDS held at the University of Wales, Bangor on 9-12 September 1998 ; 1998 ; Bangor
1998-01-01
16 pages
Second copy on order
Conference paper
English
reservoirs , dam , BDS
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
British Library Conference Proceedings | 2008
|Construction of a cement-bentonite slurry trench cut-off at Pebley Dam
British Library Conference Proceedings | 2000
|Soil-Bentonite Slurry Trench Cutoff Wall Longevity
British Library Conference Proceedings | 2018
|Cement-Bentonite Slurry Systems
British Library Conference Proceedings | 2012
|The Use of HDPE Sheets in Cement-Bentonite Slurry Cutoff Wall for Pollutant Containment
British Library Conference Proceedings | 2008
|