A platform for research: civil engineering, architecture and urbanism
Non-ballasted track in railway tunnels - A cost-effective solution case study - Pannerdensch Kanaal railway tunnel
Non-ballasted track in railway tunnels - A cost-effective solution case study - Pannerdensch Kanaal railway tunnel
Non-ballasted track in railway tunnels - A cost-effective solution case study - Pannerdensch Kanaal railway tunnel
Van Seters, A. (author) / Smits, M. T. H. (author) / Heijmans, R. W. G. M. (author) / Jansen, J. A. G. (author) / Barends, F. B. J. / Netherlands Society of Soil Mechanics and Geotechnical Engineering
European conference; 12th, Geotechnical engineering for transportation infrastructure: theory and practice, planning and design, construction and maintenance; Soil mechanics and geotechnical engineering ; 1999 ; Amsterdam
1999-01-01
6 pages
Text in English or French
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Pannerdensch Kanaal Railway Tunnel: Adjusting (to) the soil
British Library Conference Proceedings | 2001
|Online Contents | 1997
Measurement of Ballasted Track Stiffness by FWD for Railway
TIBKAT | 2019
|