A platform for research: civil engineering, architecture and urbanism
Layout and construction of the underground structures at the Xiaolangdi Multipurpose Dam Project
Layout and construction of the underground structures at the Xiaolangdi Multipurpose Dam Project
Layout and construction of the underground structures at the Xiaolangdi Multipurpose Dam Project
World tunnel congress, Vol 2; Communication tunnels; miscellaneous including water tunnels; mechanised tunnelling ; 1999 ; Oslo
1999-01-01
12 pages
Held during the 25th general assembly of the International Tunnelling Association
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
The Xiaolangdi Multipurpose Dam Project
British Library Conference Proceedings | 1999
|Design and Underground Construction at the Xiaolangdi Multipurpose Dam Site
British Library Online Contents | 1997
|Design and Underground Construction at the Xiaolangdi Multipurpose Dam Site
Online Contents | 1997
|Stability analysis for underground powerhouse and tunnels of Xiaolangdi Multipurpose Dam Project
British Library Conference Proceedings | 1999
|The stability of pilot tunnels at Xiaolangdi multipurpose dam project
British Library Conference Proceedings | 1999
|