A platform for research: civil engineering, architecture and urbanism
WEEKEND BRIDGE REPLACEMENT ON SEPTA'S 69^T^H STREET TERMINAL LOOP TRACK BRIDGE
WEEKEND BRIDGE REPLACEMENT ON SEPTA'S 69^T^H STREET TERMINAL LOOP TRACK BRIDGE
WEEKEND BRIDGE REPLACEMENT ON SEPTA'S 69^T^H STREET TERMINAL LOOP TRACK BRIDGE
Shemo, N. (author) / Pickard, S. A. (author) / Norquist, W. V. (author)
16th, International bridge conference and exhibition ; 1999 ; Pittsburgh, PA
1999-01-01
8 pages
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Weekend work: A Chicago bridge replacement
Online Contents | 1996
Chelsea Street Bridge Replacement
British Library Conference Proceedings | 1998
|Wabasha Street Bridge Replacement
British Library Online Contents | 1994
|Brightman Street Bridge Replacement Project
British Library Conference Proceedings | 2003
|Brightman Street Bridge Replacement Project
British Library Conference Proceedings | 1998
|