A platform for research: civil engineering, architecture and urbanism
Biological Nutrient Removal Design and Operation for Achieving Stringent Levels of Effluent Total Nitrogen
Biological Nutrient Removal Design and Operation for Achieving Stringent Levels of Effluent Total Nitrogen
Biological Nutrient Removal Design and Operation for Achieving Stringent Levels of Effluent Total Nitrogen
Coughenour, J. R. (author) / Piekarz, T. (author) / Kopchynski, T. (author) / Trahern, P. (author) / Cabral, K. (author) / Water Environment Federation
Symposium, Facility operations; WEFTEC '98, Water Environment Federation 71st annual conference ; 1998 ; Orlando, FL
1998-01-01
14 pages
Held as part of WEFTEC '98; See also vol 8 for abstracts
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Achieving Low Effluent Nitrogen Levels at a Unique Nutrient Removal Facility
British Library Conference Proceedings | 2004
|Alternative strategies for meeting stringent effluent guidelines
British Library Conference Proceedings | 1994
|Implementing Enhanced Pond Treatment to Meet Stringent Effluent Limits
British Library Conference Proceedings | 2015
|