A platform for research: civil engineering, architecture and urbanism
Inspections and Repair Works of the Seto Ohashi Bridge for Ten Years after its Opening
Inspections and Repair Works of the Seto Ohashi Bridge for Ten Years after its Opening
Inspections and Repair Works of the Seto Ohashi Bridge for Ten Years after its Opening
Tatsumi, M. (author) / Yasuda, M. (author) / Matsumoto, T. (author) / Miyata, T. / Fujisawa, N. / Yamada, H.
International seminar, Bridge aerodynamics perspective; Long-span bridges and aerodynamics ; 1998 ; Kobe, Japan
1999-01-01
24 pages
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Ten Years' Maintenance of Seto Ohashi Bridges
British Library Conference Proceedings | 1998
|Repainting of Seto-Ohashi Bridge for increase of durability
British Library Conference Proceedings | 2006
|Seismic retrofit of a truss bridge in Seto-Ohashi bridges
TIBKAT | 2021
|Design of Awa Shirasagi Ohashi Bridge
British Library Online Contents | 2012
PRODUCTS USED IN ... - Uchinada Ohashi Bridge
Online Contents | 2002