A platform for research: civil engineering, architecture and urbanism
The Importance of Assessing Peak Overtopping Discharge
The Importance of Assessing Peak Overtopping Discharge
The Importance of Assessing Peak Overtopping Discharge
Besley, P. (author) / Great Britain
Conference; 35th, River and coastal engineers ; 2000 ; Keele
2000-01-01
7-3
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Test Study on Overtopping Breaching Process of Earth Dam and Peak discharge
British Library Conference Proceedings | 2013
|Modeling Flood Peak Discharge Caused by Overtopping Failure of a Landslide Dam
DOAJ | 2021
|ID 617 EXPERIMENTAL STUDY ON OVERTOPPING BREACHING PROCESS OF EARTH DAM AND PEAK DISCHARGE
TIBKAT | 2018
|Seawall overtopping simulation device and overtopping simulation method
European Patent Office | 2024
|