A platform for research: civil engineering, architecture and urbanism
Appropriate Risk Allocation in Design-Build Request for Proposals (RPFs)
Appropriate Risk Allocation in Design-Build Request for Proposals (RPFs)
Appropriate Risk Allocation in Design-Build Request for Proposals (RPFs)
Molenaar, K. (author) / Vanegas, J. A. (author) / Martinez, H. (author) / Walsh, K. D. / American Society of Civil Engineers
6th, Construction congress; building together for a better tomorrow in an increasingly complex world ; 2000 ; Orlando, FL
2000-01-01
10 pages
Includes bibliographical references and index
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Appropriate Risk Allocation in Design-Build RFPs
ASCE | 2000
|Determining Optimal Proportion of Design in Design-Build Request for Proposals
British Library Online Contents | 2013
|Determining Optimal Proportion of Design in Design-Build Request for Proposals
Online Contents | 2013
|Selecting appropriate projects for design-build procurement
British Library Conference Proceedings | 1999
|