A platform for research: civil engineering, architecture and urbanism
Mission Valley Shopping Centre: Prefabricated Vertical Drains Keep Embankment Construction on Schedule
Mission Valley Shopping Centre: Prefabricated Vertical Drains Keep Embankment Construction on Schedule
Mission Valley Shopping Centre: Prefabricated Vertical Drains Keep Embankment Construction on Schedule
8th, Geosynthetics conference ; 2001 ; Portland, OR
2001-01-01
14 pages
Conference paper
English
geosynthetics , industrial fabrics , IFAI , NAGS , GMA
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Full-Scale Embankment Consolidation Test using Prefabricated Vertical Thermal Drains
British Library Online Contents | 2010
|Performance of Test Embankment with Geogrid and Prefabricated Vertical Drains
British Library Conference Proceedings | 1994
|Prefabricated Vertical Drains (Wick Drains)
British Library Online Contents | 2016
Prefabricated Vertical Drains (Wick Drains)
British Library Online Contents | 2018
Combined effects of reinforcement and prefabricated vertical drains on embankment performance
Online Contents | 2001
|