A platform for research: civil engineering, architecture and urbanism
Groundwater Cut-Off for Jacked Tunnel with Ground Freezing
Groundwater Cut-Off for Jacked Tunnel with Ground Freezing
Groundwater Cut-Off for Jacked Tunnel with Ground Freezing
Lacy, H. S. (author) / Rice, P. M. (author) / Deming, P. W. (author) / Schmall, P. (author) / Hilton, D. E. / Samuelson, K.
Rapid excavation and tunneling conference ; 1999 ; Orlando, FL
1999-01-01
12 pages
Also known as RETC 1999
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
ASCE | 1999
|Heinenoord Tunnel - Tunnel jacked underground with concrete
Online Contents | 1998
|British Library Conference Proceedings | 1999
|Heinenoord Tunnel - Tunnel jacked underground with concrete
British Library Online Contents | 1998
Calais sewer jacked trough sandy ground
Tema Archive | 1995
|