A platform for research: civil engineering, architecture and urbanism
Geotechnical design & construction aspects of the Tsing Tsuen Tunnels - KCRC West Rail Phase; Contract DB320
Geotechnical design & construction aspects of the Tsing Tsuen Tunnels - KCRC West Rail Phase; Contract DB320
Geotechnical design & construction aspects of the Tsing Tsuen Tunnels - KCRC West Rail Phase; Contract DB320
Storry, R. B. (author) / Stenning, A. S. (author) / Ho, K. K. S. / Li, K. S.
14th, Southeast Asian geotechnical conference; Geotechnical engineering ; 2001 ; Hong Kong
2001-01-01
6 pages
Vols 1 and 2 out of a 3-vol set only held
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
British Library Conference Proceedings | 2003
|British Library Conference Proceedings | 2003
|Kowloon Southern Link - TBM crossing over MTR Tsuen Wan Line tunnels in HKSAR
British Library Conference Proceedings | 2009
|Sustainable geotechnical design for the Tsing Yi North Coastal Road, Hong Kong
British Library Conference Proceedings | 2001
|