A platform for research: civil engineering, architecture and urbanism
Productivity parameters from TBM excavations of "Pont Ventoux" Hydroelectric Power Plant Tunnels (AEM Torino S.p.a)
Productivity parameters from TBM excavations of "Pont Ventoux" Hydroelectric Power Plant Tunnels (AEM Torino S.p.a)
Productivity parameters from TBM excavations of "Pont Ventoux" Hydroelectric Power Plant Tunnels (AEM Torino S.p.a)
Venturini, G. (author) / Damiano, A. (author) / Spano, M. (author) / Gallara, F. (author) / De Crecchio, L. (author) / Teuscher, P. / Colombo, A. / Swiss Tunnelling Society / Societa Italiana Gallerie
AITES-ITA World tunnel congress ; 2001 ; Milan, Italy
AITES-ITA World tunnel congress ; 485-492
2001-01-01
8 pages
Conference paper
English
tunnel , AITES , ITA , STS , tunnelling
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Design of Pont Ventoux power cavern
British Library Conference Proceedings | 2001
|Pont Ventoux-Susa: Italy's next major dam
Online Contents | 1997
Susa Gorge : A demodulation reservoir for Pont Ventoux hydro power plant
British Library Conference Proceedings | 2009
|TUNNELLING - Going underground -- The best option for Pont Ventoux-Susa
Online Contents | 2002
Drac-Romanche hydroelectric plant at Pont-de-Claix
Engineering Index Backfile | 1925
|