A platform for research: civil engineering, architecture and urbanism
TR-152 COST AND TIME OVERRUNS IN HIGHWAY CONSTRUCTION
TR-152 COST AND TIME OVERRUNS IN HIGHWAY CONSTRUCTION
TR-152 COST AND TIME OVERRUNS IN HIGHWAY CONSTRUCTION
Vidalis, S. F. (author) / Najafi, F. T. (author) / Nollet, M.-J. / Trepanier, M. / Canadian Society for Civil Engineering
4th, Transportation speciality conference ; 2002 ; Montreal, Canada
2002-01-01
t-59
Held during the 30th Canadian Society for Civil Engineering conference; See also same shelfmark for paper copy of abstracts. CD-ROM shelved in Conference Index
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Latent geotechnical pathogens inducing cost overruns in highway projects
Emerald Group Publishing | 2017
|Construction Claims and Disputes: Causes and Cost-Time Overruns
Online Contents | 1994
|Construction Claims and Disputes: Causes and Cost/Time Overruns
British Library Online Contents | 1994
|Construction Claims and Disputes: Causes and Cost-Time Overruns
Online Contents | 1996
|Root-Cause Analysis of Construction-Cost Overruns
ASCE | 2013
|