A platform for research: civil engineering, architecture and urbanism
Souterrain The Hague: clogging of groundwater wells above a gel layer during construction of an underground tram station
Souterrain The Hague: clogging of groundwater wells above a gel layer during construction of an underground tram station
Souterrain The Hague: clogging of groundwater wells above a gel layer during construction of an underground tram station
Luger, H. J. (author) / van der Hoek, E. E. (author) / van Tol, A. F. (author) / Saveur, J.
ITA world tunnelling congress; (Re)Claiming the underground space ; 2003 ; Amsterdam, The Netherlands
2003-01-01
8 pages
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Online Contents | 2012
Souterrain The Hague: imperfections in jetgrout layers
British Library Conference Proceedings | 2003
|Souterrain The Hague: scouring in case of sand boils through a jetgrout layer
British Library Conference Proceedings | 2003
|Souterrain The Hague: re-design construction method and recent experiences with grout layers
British Library Conference Proceedings | 2003
|