A platform for research: civil engineering, architecture and urbanism
Anchoring the Way to Long-Term Remediation
Anchoring the Way to Long-Term Remediation
Anchoring the Way to Long-Term Remediation
Oxendine, B. E. (author) / Shiers, P. F. (author) / Mochrie, B. N. (author) / Buratto, M. D. (author) / Lyon, J. (author) / United States Society on Dams
Annual conference; 23rd, United States Society on Dams; Reducing risk from extreme events ; 2003 ; Charleston, SC
2003-01-01
16 pages
Conference paper
English
USSD , dam safety , reducing risk , hydraulics , dams , extreme events
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
METHOD OF GROUT SELECTION FOR LONG TERM INTEGRITY OF ANCHORING PILES
European Patent Office | 2024
|METHOD OF GROUT SELECTION FOR LONG TERM INTEGRITY OF ANCHORING PILES
European Patent Office | 2024
|METHOD OF GROUT SELECTION FOR LONG TERM INTEGRITY OF ANCHORING PILES
European Patent Office | 2024
|Brass in pockets - Long-term sustainable remediation in Newcastle
Online Contents | 2000
Stabilization-based soil remediation should consider long-term challenges
Springer Verlag | 2018
|