A platform for research: civil engineering, architecture and urbanism
The response of buildings in Park Place to underground excavation and compensation grouting - a case study from the Jubilee Line Extension, London
The response of buildings in Park Place to underground excavation and compensation grouting - a case study from the Jubilee Line Extension, London
The response of buildings in Park Place to underground excavation and compensation grouting - a case study from the Jubilee Line Extension, London
Standing, J. R. (author) / Gras, M. (author) / Taylor, G. R. (author) / Gupta, S. C. (author) / Burland, J. B. (author) / Jardine, F. M. / Construction Industry Research and Information Association
Response of Buildings to Excavation-induced Ground Movements Conference ; 2001 ; London, England
2003-01-01
22 pages
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
British Library Conference Proceedings | 2002
|The new Jubilee Line Extension in London Compensation grouting
Online Contents | 1997
|The new Jubilee Line Extension in London Compensation grouting
British Library Online Contents | 1997
|Bermondsey Underground Station, Jubilee Line Extension, London
British Library Online Contents | 2000
Southwark Underground Station, Jubilee Line Extension, London
British Library Online Contents | 2000