A platform for research: civil engineering, architecture and urbanism
S12-03 Simulation of Construction Planning or High-rise RC Building a Process Plan Considering Overtime Work
S12-03 Simulation of Construction Planning or High-rise RC Building a Process Plan Considering Overtime Work
S12-03 Simulation of Construction Planning or High-rise RC Building a Process Plan Considering Overtime Work
Endo, K. (author) / Chien, Y.-F. (author) / Kimoto, K. (author) / Korea Robotics Society / Electronics and Telecommunications Research Institute
21st:; International Symposium, Automation and robotics in construction; ISARC 2004 ; 2004 ; Jeju, Korea
2004-01-01
6 pages
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Accelerated work-schedule design considering efficiency losses for overtime and overmanning
Emerald Group Publishing | 2003
|Accelerated work-schedule design considering efficiency losses for overtime and overmanning
Online Contents | 2003
|Overtime and Productivity in Electrical Construction
British Library Conference Proceedings | 2009
|Overtime and Productivity in Electrical Construction
ASCE | 2009
|