A platform for research: civil engineering, architecture and urbanism
Tala Hydroelectric Project: Excavation of Head Race Tunnel in Poor Geology
Tala Hydroelectric Project: Excavation of Head Race Tunnel in Poor Geology
Tala Hydroelectric Project: Excavation of Head Race Tunnel in Poor Geology
9th:; CONGRESS, International Association for Engineering Geology and the Environment; Engineering geology for developing countries ; 2002 ; Durban
2002-01-01
P231
Text in English with selected summaries also in French.; HELD ON CD-ROM
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Underground Tunnelling Works with Tala Hydroelectric Project Authority
British Library Conference Proceedings | 2000
|Use of Alkali Free Accelerators in Tala Hydroelectric Project
British Library Conference Proceedings | 2000
|Handling the blockades while excavating the surge shaft at Tala Hydroelectric Project
Online Contents | 2008
|1020 MW Tala Hydroelectric Project (Bhutan) - A Fast Track Construction Model
British Library Conference Proceedings | 2000
|