A platform for research: civil engineering, architecture and urbanism
REHABILITATION OF THE HAWTHORNE STREET BRIDGE UTILIZING AN FRP DECK SYSTEM
REHABILITATION OF THE HAWTHORNE STREET BRIDGE UTILIZING AN FRP DECK SYSTEM
REHABILITATION OF THE HAWTHORNE STREET BRIDGE UTILIZING AN FRP DECK SYSTEM
Majumdar, P. K. (author) / Liu, Z. (author) / Cousins, T. E. (author) / Lesko, J. J. (author) / Hamelin, P. / Universite de Lyon I
3rd, Composites in construction; CCC 2005 ; 2005 ; Lyon, France
2005-01-01
8 pages
Includes bibliographical references and index.; See 4538.768454V 3rd 2005 for papers on CD-ROM (held in Conference Index); ALSO HELD ON CD-ROM
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Rehabilitation Design and Evaluation of the Hawthorne Street Bridge FRP Deck Installation
British Library Conference Proceedings | 2004
|NTIS | 1977
Bridge Deck Joint Rehabilitation or Retrofitting
NTIS | 1988
|Waterproofing Membranes for Bridge Deck Rehabilitation
NTIS | 1977
|