A platform for research: civil engineering, architecture and urbanism
Variations in a Typical Lower Jingjiang River Reach below the Three Gorges Project: a Preliminary Study
Variations in a Typical Lower Jingjiang River Reach below the Three Gorges Project: a Preliminary Study
Variations in a Typical Lower Jingjiang River Reach below the Three Gorges Project: a Preliminary Study
9th:; International Symposium, River sedimentation; interactions between fluvial systems and hydraulic projects and pertinent environmental impacts ; 2004 ; Yichang, China
2004-01-01
6 pages
See also 6846.847001V for papers held on CD-ROM
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
HENRY – Federal Waterways Engineering and Research Institute (BAW) | 2012
|British Library Conference Proceedings | 2004
|Regulation of Laijiapu Waterway in Jingjiang Reach
British Library Conference Proceedings | 2014
|Evaluating Regime Change of Sediment Transport in the Jingjiang River Reach, Yangtze River, China
DOAJ | 2018
|Study of Jingjiang Beach Morphodynamics in the Tidal Reach of the Yangtze River
DOAJ | 2022
|