A platform for research: civil engineering, architecture and urbanism
A14 Huntingdon Railway Viaduct - half joint strengthening works
A14 Huntingdon Railway Viaduct - half joint strengthening works
A14 Huntingdon Railway Viaduct - half joint strengthening works
Welsford, R. (author) / St Leger, J. (author) / Alefs, D. (author) / Parke, G. A. R. / Disney, P.
5th:; International conference, Bridge management; inspection, maintenance, assessment and repair ; 2005 ; Guildford
2005-01-01
8 pages
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
A14 Huntingdon Railway Viaduct
British Library Conference Proceedings | 2000
|A14 Huntingdon Railway Viaduct re-grouting of post-tensioning tendon ducts
British Library Conference Proceedings | 2005
|DESIGN OF STRENGTHENING WORKS AT AUCHTERTYRE VIADUCT, CRIANLARICH
British Library Conference Proceedings | 2002
|Strengthening taradale viaduct
Engineering Index Backfile | 1934
Notes on the strengthening of the Waiteti railway viaduct
Engineering Index Backfile | 1929
|