A platform for research: civil engineering, architecture and urbanism
Observations from the First Year of Full-Scale Operation: The IFAS/BNR Process at the Broomfield Wastewater Reclamation Facility, Broomfield, CO
Observations from the First Year of Full-Scale Operation: The IFAS/BNR Process at the Broomfield Wastewater Reclamation Facility, Broomfield, CO
Observations from the First Year of Full-Scale Operation: The IFAS/BNR Process at the Broomfield Wastewater Reclamation Facility, Broomfield, CO
McQuarrie, J. (author) / Rutt, K. (author) / Seda, J. (author) / Haegh, M. (author) / Water Environment Federation
77th:; ANNUAL TECHNICAL EXHIBITION AND CONFERENCE, Water Environment Federation; WEFTEC 04 ; 2004 ; New Orleans, LA
2004-01-01
P534
HELD ON CD-ROM
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Two Year Case Study of Integrated Fixed Film Activated Sludge (IFAS) At Broomfield, Co WWTP
British Library Conference Proceedings | 2006
|John P. Broomfield, 2013 Thomas B. Deen Distinguished Lecturer
British Library Online Contents | 2013
Corrosion Books: Corrosion of Steel in Concrete. By: John P. Broomfield
British Library Online Contents | 2007
|Corrosion monitoring - Dr. J. Broomfield discusses projects to install corrosion monitoring systems
Online Contents | 1998
|