A platform for research: civil engineering, architecture and urbanism
Construction of the Big Walnut Augmentation/Rickenbacker Interceptor Tunnel (BWARI, Part 1) -Columbus, Ohio
Construction of the Big Walnut Augmentation/Rickenbacker Interceptor Tunnel (BWARI, Part 1) -Columbus, Ohio
Construction of the Big Walnut Augmentation/Rickenbacker Interceptor Tunnel (BWARI, Part 1) -Columbus, Ohio
Theys, J. P. (author) / Shinouda, M. M. (author) / Gilbert, G. W. (author) / Frank, G. D. (author) / Traylor, M. T. / Townsend, J. W. / Society of Mining, Metallurgy and Exploration
Rapid excavation and tunneling conference; RETC ; 2007 ; Toronto, Canada
2007-01-01
29 pages
Conference paper
English
Rapid excavation , Tunneling , RETC , Mining , Metallurgy
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
British Library Conference Proceedings | 2007
|Selecting an Alignment for the Blacklick Creek Sanitary Interceptor Sewer Tunnel-Columbus, Ohio
British Library Conference Proceedings | 2010
|Hilltop Interceptor Contract G Storage and Conveyance Tunnel, Cleveland, Ohio
British Library Conference Proceedings | 1997
|UB Braunschweig | 1931
|