A platform for research: civil engineering, architecture and urbanism
Driving the Twin Bore Running Tunnels by Earth Pressure Balance Machine on the Sound Transit C-710 Beacon Hill Station and Tunnels Project
Driving the Twin Bore Running Tunnels by Earth Pressure Balance Machine on the Sound Transit C-710 Beacon Hill Station and Tunnels Project
Driving the Twin Bore Running Tunnels by Earth Pressure Balance Machine on the Sound Transit C-710 Beacon Hill Station and Tunnels Project
Redmond, S. (author) / Tattersall, C. (author) / Garavelli, N. (author) / Kudo, T. (author) / Raleigh, P. (author) / Lehnen, M. J. (author) / Traylor, M. T. / Townsend, J. W. / Society of Mining, Metallurgy and Exploration
Rapid excavation and tunneling conference; RETC ; 2007 ; Toronto, Canada
2007-01-01
15 pages
Conference paper
English
Rapid excavation , Tunneling , RETC , Mining , Metallurgy
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
British Library Conference Proceedings | 2007
|Design and Risk Management Strategy for the Sound Transit Beacon Hill Station and Tunnels
British Library Conference Proceedings | 2005
|Engineering Index Backfile | 1940
|Use of FLAC^3^D on Beacon Hill Station and Tunnels project in Seattle, Washington
British Library Conference Proceedings | 2006
|British Library Online Contents | 1998
|