A platform for research: civil engineering, architecture and urbanism
Construction of the C710 Beacon Hill Station Using SEM in Seattle-``Every Chapter in the Book...''
Construction of the C710 Beacon Hill Station Using SEM in Seattle-``Every Chapter in the Book...''
Construction of the C710 Beacon Hill Station Using SEM in Seattle-``Every Chapter in the Book...''
Akai, S. (author) / Murray, M. (author) / Redmond, S. (author) / Sage, R. (author) / Shetty, R. (author) / Skalla, G. (author) / Varley, Z. (author) / Traylor, M. T. / Townsend, J. W. / Society of Mining, Metallurgy and Exploration
Rapid excavation and tunneling conference; RETC ; 2007 ; Toronto, Canada
2007-01-01
21 pages
Conference paper
English
Rapid excavation , Tunneling , RETC , Mining , Metallurgy
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Construction of the C710 Beacon Hill Station Using SEM in Seattle-``Every Chapter in the Book...''
British Library Conference Proceedings | 2007
|SEM tunneling underway in Seattle - construction of the Beacon Hill Station
British Library Conference Proceedings | 2006
|Lining the beacon hill sewer tunnel at Seattle
Engineering Index Backfile | 1930
Capitol Hill Station, Seattle, USA
British Library Online Contents | 2014
|Beacon Hill Station Shotcrete Application
British Library Conference Proceedings | 2006
|