A platform for research: civil engineering, architecture and urbanism
Design-Build of the Lake Hodges to Olivenhain Pipeline Tunnel and Shaft
Design-Build of the Lake Hodges to Olivenhain Pipeline Tunnel and Shaft
Design-Build of the Lake Hodges to Olivenhain Pipeline Tunnel and Shaft
Piek, M.L. (author) / Kaneshiro, J.Y. (author) / Menge, S.A. (author) / Barker, B. (author) / Traylor, M.T. / Townsend, J.W. / Society for Mining, Metallurgy, and Exploration (U.S.)
Rapid excavation and tunneling conference ; 2007 ; Toronto, Canada
2007-01-01
7 pages
Also known as RETC. Held on CD-ROM
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Design-Build of the Lake Hodges to Olivenhain Pipeline Tunnel and Shaft
British Library Conference Proceedings | 2007
|Lake Hodges to Olivenhain Pipeline Tunnel, Shaft, and Site Development: Use of ASTM A841 TMCP Steel
British Library Conference Proceedings | 2006
|British Library Conference Proceedings | 2006
|British Library Online Contents | 2003
|