A platform for research: civil engineering, architecture and urbanism
TE-6-1 Optimizing RC bridge inspection/repair schedules with pre-posterior decision making
TE-6-1 Optimizing RC bridge inspection/repair schedules with pre-posterior decision making
TE-6-1 Optimizing RC bridge inspection/repair schedules with pre-posterior decision making
Qin, Q. (author) / Wang, J.X. (author) / Kanda, J. / Takada, T. / Furuta, H.
10th, International conference on applications of statistics and probability in civil engineering; ICASP 10 ; 2007 ; Tokyo
2007-01-01
4 pages
Also held on CD-ROM. Also known as ICASP10; Includes bibliographical references and index
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Bridge inspection/repair schedule optimization with pre-posterior decision analysis
British Library Conference Proceedings | 2005
|Bridge Inspection Decision Making Based on Sequential Hypothesis Testing Methods
British Library Conference Proceedings | 2000
|Bridge Inspection Decision Making Based on Sequential Hypothesis Testing Methods
British Library Online Contents | 2000
|Evaluation of models for decision making in inspection and repair maintenance
BASE | 1987
|