A platform for research: civil engineering, architecture and urbanism
Seepage Through Different Concrete Cut Off Wall Connection Systems Case Study: Karkheh Storage Dam
Seepage Through Different Concrete Cut Off Wall Connection Systems Case Study: Karkheh Storage Dam
Seepage Through Different Concrete Cut Off Wall Connection Systems Case Study: Karkheh Storage Dam
Zoorasna, Z. (author) / Hamidi, A. (author) / Ghanbari, A. (author) / Mitchell, J.K. / Prakash, S. / Missouri University of Science and Technology
International Conference; August 11-16, 2008, Arlington, Virginia; 6th, Case histories in geotechnical engineering ; 2008 ; Arlington, VA
2008-01-01
2.89
Held in e-store (RMS)
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
British Library Conference Proceedings | 2008
|Plastic Concrete Specification A Case Study-Karkheh Dam Project
British Library Conference Proceedings | 2001
|Karkheh Storage Dam Cutoff Wall Analysis and Design 2.71
British Library Conference Proceedings | 2004
|THERMAL MONITORING OF LEAKAGE THROUGH KARKHEH EMBANKMENT DAM, SOUTHWEST IRAN
British Library Conference Proceedings | 2007
|