A platform for research: civil engineering, architecture and urbanism
Construction of a Plastic Concrete Seepage Cutoff Wall for the New Coquitlam Dam
Construction of a Plastic Concrete Seepage Cutoff Wall for the New Coquitlam Dam
Construction of a Plastic Concrete Seepage Cutoff Wall for the New Coquitlam Dam
Yan, L. (author) / Trapp, D.A. (author) / Sy, A. (author) / Mitchell, J.K. / Prakash, S. / Missouri University of Science and Technology
International Conference; August 11-16, 2008, Arlington, Virginia; 6th, Case histories in geotechnical engineering ; 2008 ; Arlington, VA
2008-01-01
5.26-5.28
Held in e-store (RMS)
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Seepage Cutoff Wall Design and Construction in Mud Mountain Dam
British Library Conference Proceedings | 1991
|Evolution of USACE Seepage Cutoff Wall Contracts
ASCE | 2017
|Serious Seepage Problems at McAlpine Locks & DamLead to Concrete Cutoff Wall Remediations
British Library Conference Proceedings | 1994
|