A platform for research: civil engineering, architecture and urbanism
PCCP Inspection: Prioritizing Risk, Assessing Shutdown Impacts, and Executing the Inspection
PCCP Inspection: Prioritizing Risk, Assessing Shutdown Impacts, and Executing the Inspection
PCCP Inspection: Prioritizing Risk, Assessing Shutdown Impacts, and Executing the Inspection
Williams, B.A. (author) / Ablin, R.L. (author) / Kelso, B.A. (author) / American Society of Civil Engineers
ASCE International Conference on Pipeline Engineering and Construction; ``Advances and Construction (Pipelines 2007) ``Advances and experiences with trenchless pipeline projects'' ; 2007 ; Boston, MA
2007-01-01
9 pages
Includes bibliographic references. Conference held in 2 volumes
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
In-Line Electromagnetic Inspection of PCCP
British Library Conference Proceedings | 1998
|PCCP Inspection and Remediation Methods
British Library Conference Proceedings | 1993
|Internal Inspection and Database Development of PCCP
British Library Conference Proceedings | 1998
|Executing an Asset Management Plan for Large Diameter PCCP
TIBKAT | 2019
|Assessing PCCP Transmission Mains
British Library Conference Proceedings | 2007
|