A platform for research: civil engineering, architecture and urbanism
How a Directional Drilled River Crossing Water Main Saved Significant Permitting Requirements, Construction Time and Money, Aroostook River, Caribou, Maine
How a Directional Drilled River Crossing Water Main Saved Significant Permitting Requirements, Construction Time and Money, Aroostook River, Caribou, Maine
How a Directional Drilled River Crossing Water Main Saved Significant Permitting Requirements, Construction Time and Money, Aroostook River, Caribou, Maine
Lary, D.D. (author) / American Society of Civil Engineers
ASCE International Conference on Pipeline Engineering and Construction; ``Advances and Construction (Pipelines 2007) ``Advances and experiences with trenchless pipeline projects'' ; 2007 ; Boston, MA
2007-01-01
8 pages
Includes bibliographic references. Conference held in 2 volumes
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
British Library Conference Proceedings | 2007
|DOAJ | 2022
|Horizontal Directionally Drilled River Crossing Meets Regional Water Needs
British Library Conference Proceedings | 1998
|Directionally Drilled Crossing Constructed Under River Levee
Online Contents | 1996