A platform for research: civil engineering, architecture and urbanism
When Conventional Design Bid Build Approach is Unconventional - Design and Bidding of IFAS Full-Scale Pilot at Greensboro, North Carolina
When Conventional Design Bid Build Approach is Unconventional - Design and Bidding of IFAS Full-Scale Pilot at Greensboro, North Carolina
When Conventional Design Bid Build Approach is Unconventional - Design and Bidding of IFAS Full-Scale Pilot at Greensboro, North Carolina
Gellner, W.J. (author) / Samel, L. (author) / Howard, D. (author) / Stone, A. (author) / Pitt, P. (author) / Water Environment Federation
Annual technical exhibition & conference; 81st, Water Environment Federation; WEFTEC.08 ; 2008 ; Chicago, IL
2008-01-01
410 pages
Includes bibliographical references and index; Held in e-store (RMS); Held on CD-ROM
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Innovations in Stormwater Inventory Data Collection: City of Greensboro, North Carolina
British Library Conference Proceedings | 2001
|Optimizing IFAS and MBBR Designs Using Full-Scale Data
British Library Conference Proceedings | 2008
|