A platform for research: civil engineering, architecture and urbanism
Design and Construction of Lake Mead Intake No. 3 Shafts and Tunnel
Design and Construction of Lake Mead Intake No. 3 Shafts and Tunnel
Design and Construction of Lake Mead Intake No. 3 Shafts and Tunnel
Hurt, J. (author) / McDonald, J. (author) / Sherry, G. (author) / McGinn, A.J. (author) / Piek, L. (author) / Almeraris, G. / Mariucci, B. / Society for Mining, Metallurgy, and Exploration (U.S.)
19th, Rapid excavation and tunneling conference ; 2009 ; Las Vegas, NV
2009-01-01
15 pages
Includes bibliographical references and index
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Intake tunnel construction at Lake Mead
British Library Conference Proceedings | 2000
|Blind drilling well shafts for Lake Mead Intake 2
British Library Conference Proceedings | 2000
|Lake Mead Underwater Intake Structure and Tunnel Connection-Lake Mead Intake No. 3 Tunnel Project
British Library Conference Proceedings | 2011
|British Library Online Contents | 2009
|