A platform for research: civil engineering, architecture and urbanism
8 m Diameter 7 km Long Beles Tailrace Tunnel (Ethiopia) Bored and Lined in Basaltic Formations in Less than 12 Months
8 m Diameter 7 km Long Beles Tailrace Tunnel (Ethiopia) Bored and Lined in Basaltic Formations in Less than 12 Months
8 m Diameter 7 km Long Beles Tailrace Tunnel (Ethiopia) Bored and Lined in Basaltic Formations in Less than 12 Months
Raschilla, A. (author) / Bartimoccia, F. (author) / Almeraris, G. / Mariucci, B. / Society for Mining, Metallurgy, and Exploration (U.S.)
19th, Rapid excavation and tunneling conference ; 2009 ; Las Vegas, NV
2009-01-01
13 pages
Includes bibliographical references and index
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Challenges in Large-Diameter Bored Piling in Coralline Rock Formations
Springer Verlag | 2024
|