A platform for research: civil engineering, architecture and urbanism
Response of sewer concrete pipes rehabilitated by CIPP through full-scale model tests
Response of sewer concrete pipes rehabilitated by CIPP through full-scale model tests
Response of sewer concrete pipes rehabilitated by CIPP through full-scale model tests
Inoue, Y. (author) / Yoshimura, H. (author) / Tohda, J. (author) / Ohsugi, A. (author) / Ng, C.W.W. / Wang, Y.H. / Zhang, L.M.
proceedings of the Sixth International Conference on Physical Modelling in Geotechnics - 6th ICPMG '06; International conference; 6th, Physical modelling in geotechnics ; 2006 ; Hong Kong
Physical modelling in geotechnics ; 735-740
2006-01-01
6 pages
Includes bibliographical references and author index
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Response of sewer concrete pipes rehabilitated by CIPP through full-scale model tests
British Library Conference Proceedings | 2006
|Response of sewer concrete pipes rehabilitated by CIPP through full-scale model tests
British Library Conference Proceedings | 2006
|Dynamic response of sewer pipes rehabilitated by CIPP through centrifuge model tests
British Library Conference Proceedings | 2006
|Response of sewer concrete pipes rehabilitated by CIPP through two-edge loading tests
British Library Conference Proceedings | 2006
|Response of sewer concrete pipes rehabilitated by CIPP through two-edge loading tests
British Library Conference Proceedings | 2006
|