A platform for research: civil engineering, architecture and urbanism
Trench Cutting Remixing Deep (TRD) Method for Vertically Mixed-In-Place Cutoff Wall Construction at Herbert Hoover Dike
Trench Cutting Remixing Deep (TRD) Method for Vertically Mixed-In-Place Cutoff Wall Construction at Herbert Hoover Dike
Trench Cutting Remixing Deep (TRD) Method for Vertically Mixed-In-Place Cutoff Wall Construction at Herbert Hoover Dike
Garbin, E.J. (author) / Evans, J.C. (author) / Hussin, J.D. (author) / Association of Dam Safety Officials
Conference, Association of State Dam Safety Officials ; 2009
2009-01-01
10 pages
Includes bibliographical references
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Cutoff Wall Construction by the Self-Hardening Slurry Method at the Herbert Hoover Dike, FL
British Library Conference Proceedings | 2010
|Herbert Hoover Dike: Major Rehabilitation
British Library Conference Proceedings | 2006
|Herbert Hoover Dike: Major Rehabilitation
British Library Conference Proceedings | 2007
|Installation of a Seepage Cutoff Wall at the Herbert Hoover Dike Using the Cutter Soil Mixing Method
British Library Conference Proceedings | 2012
|