A platform for research: civil engineering, architecture and urbanism
Corrosion of reinforcement in the concrete cover of bridge and hydrotechnical constructions
Corrosion of reinforcement in the concrete cover of bridge and hydrotechnical constructions
Corrosion of reinforcement in the concrete cover of bridge and hydrotechnical constructions
Workshop; 2nd, Concrete durability and service life planning; ConcreteLife'09 ; 2009 ; Haifa, Israel
2009-01-01
7 pages
Includes bibliographical references
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Piping processes and stability of hydrotechnical constructions
British Library Conference Proceedings | 1998
|COMPOSITION OF CEMENT-POLYMER CONCRETE MIXTURE FOR REPAIRING HYDROTECHNICAL CONSTRUCTIONS (OPTIONS)
European Patent Office | 2019
|Concretes on volcanite aggregates for hydrotechnical constructions
British Library Conference Proceedings | 2003
|METHOD OF SEALING SEWAGE OF WATER CONDUCTING HYDROTECHNICAL CONSTRUCTIONS
European Patent Office | 2018
|Eighth Joint Meeting on Hydrotechnical Concrete
Online Contents | 1967
|