A platform for research: civil engineering, architecture and urbanism
Excavation Support for Jacking and Receiving Shafts on the East Boston Sewer Relief Project
Excavation Support for Jacking and Receiving Shafts on the East Boston Sewer Relief Project
Excavation Support for Jacking and Receiving Shafts on the East Boston Sewer Relief Project
3rd, Earth Retention Conference ; 2010 ; Bellevue, WA
2010-01-01
8 pages
Includes bibliographical references and index.
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Pipe jacking with variable excavation methods for the construction of relief sewer Wuppertal-Lot 3
British Library Conference Proceedings | 1995
|Pre-Excavation Grouting for the OARS Relief Sewer, Phase 2 Shafts and Adits, Columbus, Ohio
British Library Conference Proceedings | 2015
|British Library Online Contents | 2011
|