A platform for research: civil engineering, architecture and urbanism
Optimal restoration scheduling considering multiple group work under uncertain environments
Optimal restoration scheduling considering multiple group work under uncertain environments
Optimal restoration scheduling considering multiple group work under uncertain environments
Nakatsu, K. (author) / Furuta, H. (author) / Nomura, Y. (author) / Ishibashi, K. (author) / Hattori, H. (author) / Furuta, H. / Frangopol, D.M. / Shinozuka, M.
International Conference; 10th, Structural safety and reliability; Safety, reliability and risk of structures, infrastructures and engineering systems; ICOSSAR2009 ; 2009 ; Osaka, Japan
2010-01-01
457 pages
Includes bibliographical references and index; Full Papers on CD-ROM
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Optimal scheduling of water network repair crews considering multiple objectives
BASE | 2017
|Optimal scheduling of water network repair crews considering multiple objectives
BASE | 2017
|Optimal scheduling of water network repair crews considering multiple objectives
DOAJ | 2017
|From restorative environments to restoration in work
Taylor & Francis Verlag | 2015
|