A platform for research: civil engineering, architecture and urbanism
Tied Arch Bridges with Optimized Arrangement of a Limited Number of Hangers
Tied Arch Bridges with Optimized Arrangement of a Limited Number of Hangers
Tied Arch Bridges with Optimized Arrangement of a Limited Number of Hangers
IABSE Symposium Venice 2010: Large structures and infrastructures for environmentally constrained and urbanised areas ; 2010 ; Venice, Italy
2010-01-01
2 pages
"Venice, Italy, September 22-24, 2010"--CD-ROM surface. Includes bibliographical references and index. Large structures and infrastructures for environmentally constrained and urbinised areas : 34th IABSE Symposium on Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas.
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
The effect of fatigue on the arrangement of hangers in tied arch bridges
Online Contents | 2010
|Ultimate Strength and Chain-Reaction Failure of Hangers in Tied-Arch Bridges
Taylor & Francis Verlag | 2021
|Timber Arch Bridges with V-shaped Hangers
Taylor & Francis Verlag | 2019
|Tied arch bridge with radial oriented hangers, subjected to rail traffic
British Library Conference Proceedings | 2003
|