A platform for research: civil engineering, architecture and urbanism
Case Study of Long-Term Ground Settlements Induced by Slurry Shield Tunnelling
Case Study of Long-Term Ground Settlements Induced by Slurry Shield Tunnelling
Case Study of Long-Term Ground Settlements Induced by Slurry Shield Tunnelling
International conferemce on civil engineering, architecture and building materials ; 2011 ; Haikou, China
2011-01-01
4 pages
Includes bibliographical references and indexes
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Case Study of Long-Term Ground Settlements Induced by Slurry Shield Tunnelling
Trans Tech Publications | 2011
|Analysis on the Embankment Settlements Induced by Slurry Shield Under-Tunnelling
Trans Tech Publications | 2011
|Analysis on the Embankment Settlements Induced by Slurry Shield Under-Tunnelling
British Library Conference Proceedings | 2011
|Prediction of ground settlements induced by twin shield tunnelling in rock and soil – A case study
DOAJ | 2022
|Modelling of Ground Deformation Control Induced by Slurry Shield Tunnelling
British Library Conference Proceedings | 2015
|