A platform for research: civil engineering, architecture and urbanism
Risk Assessment on Ground Fissure Disasters of Xi'an Metro Line 3
Risk Assessment on Ground Fissure Disasters of Xi'an Metro Line 3
Risk Assessment on Ground Fissure Disasters of Xi'an Metro Line 3
Jiang, Z.W. (author) / Wang, Q.Y. (author) / Chen, Chaohe / Huang, Yong / Li, Guangfan
conference, Advances in civil engineering ; 2011 ; Kunming, China
2011-01-01
5 pages
Includes bibliographical references and indexes.
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Risk Assessment on Ground Fissure Disasters of Xi’an Metro Line 3
Trans Tech Publications | 2011
|Protective Measures for a Tunnel on Xi’an Metro Line 6 Crossing Ground Fissure Zone
DOAJ | 2024
|A proposed solution to the ground fissure encountered in urban metro construction in Xi’an, China
Online Contents | 2017
|A proposed solution to the ground fissure encountered in urban metro construction in Xi'an, China
British Library Online Contents | 2017
|Failure Models of Buildings Affected by Xi'an Ground Fissure
British Library Conference Proceedings | 2011
|