A platform for research: civil engineering, architecture and urbanism
How design/build at Pine Brook Dam dramatically reduces schedule and costs
How design/build at Pine Brook Dam dramatically reduces schedule and costs
How design/build at Pine Brook Dam dramatically reduces schedule and costs
Shannon, D. (author) / Bowen, J.F. (author) / de Haas, R. (author) / Pepper, A.T. / British Dam Society
Conference; 16th, British Dam Society; Managing dams; challenges in a time of change ; 2010 ; Strathclyde, Scotland
2010-01-01
17 pages
Includes bibliographical references and index; See also s/m 4542.291000 vol 17 no 4 2010 for report
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Successful Application of the Design/Build Approach at Pine Brook Dam
British Library Conference Proceedings | 2006
|British Library Conference Proceedings | 2007
|British Library Online Contents | 1998
Early notification system dramatically reduces dry weather overflows
British Library Conference Proceedings | 1994
|Engineering Index Backfile | 1944
|