A platform for research: civil engineering, architecture and urbanism
Study on the Construction Time of Secondary Lining in Loess Tunnel
Study on the Construction Time of Secondary Lining in Loess Tunnel
Study on the Construction Time of Secondary Lining in Loess Tunnel
Cui, J.N. (author) / Gao, Y.T. (author) / Wang, J.Q. (author) / Li, J. (author) / Deng, F.G. (author) / Chu, Mingjin
International conference; 2nd, Civil engineering, architecture and building materials CEABM 2012 ; 2012 ; Yantai, China
2012-01-01
5 pages
Includes bibliographical references and index.
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Study on the Construction Time of Secondary Lining in Loess Tunnel
Trans Tech Publications | 2012
|Study on the Construction Time of Secondary Lining in Loess Tunnel
Tema Archive | 2012
|Load Characteristics of Tunnel Lining in Flooded Loess Strata considering Loess Structure
DOAJ | 2019
|Structural Responses of Secondary Lining of High-Speed Railway Tunnel Excavated in Loess Ground
British Library Conference Proceedings | 2013
|Structural Responses of Secondary Lining of High-Speed Railway Tunnel Excavated in Loess Ground
SAGE Publications | 2013
|