A platform for research: civil engineering, architecture and urbanism
Surface Settlement and Influence on Xi'an City Wall due to Xi'an Subway Line 2 T unnel Construction
Surface Settlement and Influence on Xi'an City Wall due to Xi'an Subway Line 2 T unnel Construction
Surface Settlement and Influence on Xi'an City Wall due to Xi'an Subway Line 2 T unnel Construction
Li, J.L. (author) / Zheng, J.G. (author) / Yao, Y.P. (author) / Li, Hui
International conference; 4th, Technology of architecture and structure; Sustainable development of urban environment and building materials ; 2011 ; Xi'an, China
2012-01-01
7 pages
Includes bibliographical references and index. ICTAS 2011.
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Surface Settlement and Influence on Xi’an City Wall due to Xi’an Subway Line 2 Tunnel Construction
Trans Tech Publications | 2011
|Standardarchitecture: Xi'an City Wall Reintegration, Xi'an, 2009
Online Contents | 2009
Prediction on Ground Surface Settlement Caused by Subway Shield Construction in Xi'an
British Library Conference Proceedings | 2013
|Prediction on Ground Surface Settlement Caused by Subway Shield Construction in Xi'an
Trans Tech Publications | 2013
|Prediction on Ground Surface Settlement Caused by Subway Shield Construction in Xi'an
Tema Archive | 2013
|