A platform for research: civil engineering, architecture and urbanism
Construction of Mixed-in-Place Cutoff Wall for Levee Strengthening Program
Construction of Mixed-in-Place Cutoff Wall for Levee Strengthening Program
Construction of Mixed-in-Place Cutoff Wall for Levee Strengthening Program
Owaidat, L. (author) / Miller, A.D. (author) / Johnson, B. (author) / Association of State Dam Safety Officials
Annual Conference, Association of State Dam Safety Officials ; 2012 ; Denver, CO
2013-01-01
12 pages
Includes bibliographical references and author index
Conference paper
English
Dam safety , Safety , ASDSO
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Construction of a Deep Slurry Cutoff Wall for the Sacramento River East Levee Program
British Library Conference Proceedings | 2021
|Construction of a Soil-Cement-Bentonite Slurry Wall for a Levee Strengthening Program
British Library Conference Proceedings | 1999
|Navigation maintained during construction of Smithland Cutoff and Levee
Engineering Index Backfile | 1954
|Levee Rehabilitation, Lower Wood River — East Alton Il. - Deep Cutoff Wall
British Library Conference Proceedings | 2017
|