A platform for research: civil engineering, architecture and urbanism
Controllable Blasting Technology of Urban Road-Cut Excavation Project under 220kV Super-Voltage Transmission Line
Controllable Blasting Technology of Urban Road-Cut Excavation Project under 220kV Super-Voltage Transmission Line
Controllable Blasting Technology of Urban Road-Cut Excavation Project under 220kV Super-Voltage Transmission Line
Xu, S.X. (author) / Chen, D.Z. (author) / Ma, Ming
International conference, Bio-medical materials and engineering; ICBME 2013 ; 2013 ; Hong Kong
2013-01-01
641 pages
Held in e-store RMS; Includes bibliographical references and index
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Method for drilling 500kV high-voltage line through 220kV double-circuit transmission line
European Patent Office | 2022
|Insulation bucket arm vehicle for 220KV power transmission line
European Patent Office | 2022
|Uncertainty Analysis of 220kV Substation Project
British Library Conference Proceedings | 2014
|Application of Level Deep-holed Blasting for Excavation Project in Urban Area
British Library Conference Proceedings | 2002
|Springer Verlag | 2016
|